"*" indicates required fields
Required fields are marked with *
Never share sensitive information (credit card numbers, social security numbers, passwords) through this form.
Please add items to your quote list by clicking the "Add to Quote" button on product pages.
A new, upgraded sewage system for London is being built; the new 25km Thames Tideway tunnel will reduce the amount of sewage waste entering the River Thames by 95 per cent. For the TMB (tunnel boring machine) to be launched, a vertical shaft was constructed. It was therefore vital to maintain good air quality within the shaft.
Working in a shaft is extremely high risk; Thames Tideway required a ventilation solution that would provide good quality air for the workers, especially as diesel plant was also operating in the shaft.
The entire shaft construction took place within a 23m high acoustic ‘head house’, minimising noise and light pollution. Taking into account the diesel plant and the possible gasses that could be present in the shaft, a bespoke ventilation system was designed, which included two Ventex CF 800S units, each providing 50,400m³/h of airflow.
Carnwath Road Riverside, London
Craig Chattell